Demolition leads
where the permit is already filed.
Sites in your service area where a new-construction or major-alteration permit has been filed, which means the demo and the excavation are about to happen. Owners and developers resolved from county records.
Verification guarantee: Any lead where I can't verify the owner or developer on the permit is replaced free within 5 business days.
Demo and site work are forward-looking. The signal isn't wear, it's a permit. When a developer files for new construction, the demo crew and the excavator are about to get the call. I find those filings and resolve who's running the project, so you're calling before everyone else.
Four checks before a site makes your list.
A different shape from the other lists: you're not bidding a tired old lot, you're bidding a project that's about to start. The verification is the permit and the project lead.
Active permit pipeline
The county building-permit portal queried for active new-construction and major-alteration permits, the records that mean site work is coming.
Owner and developer resolved
The parcel owner and, where it's on the permit, the project's general contractor or developer, the people who hire the demo and excavation crews.
Scope from the parcel
Lot size and existing-structure footprint so you know the size of the teardown before you call.
Scoped to your service radius
Every permit inside the zips you can actually mobilize to.
Three steps. A fresh list built for you.
Zero guesswork.
I Query the Permit Portal
I query the county permit portal for active new-construction and major-alteration filings in the zips you serve.
I Resolve Owner + Developer
Parcel owner from the county record, plus the GC or developer named on the permit. Contact path on every row.
You Get the List
A clean xlsx with the permit type, file date, and a permit-lookup link on every row, built fresh for your order.
See exactly what you're getting.
Sample leads from a recent demolition list. Owner & contact info redacted.
Not a lead marketplace.
Not a recycled database.
Forward-looking, not tired
The lead is a project that's about to start, not a lot that's been sitting on a sale sheet.
Owner + developer resolved
Both the parcel owner and the GC or developer on the permit, so you reach whoever is actually hiring the crews.
Scope verified
Lot size and existing-structure footprint on every row.
Time-sensitive
Permits filed within the last 30 days by default. Order on Monday, call on Wednesday, win the bid before everyone else hears about it.
One project covers the cost.
Multiple times over.
An average commercial demo job returns 3–8× your investment in this list.
- Your target area
- Permit-pipeline verified
- Owner + developer resolved
- Built fresh for your order
- Everything in Starter
- 2× the pipeline
- Wider area coverage
- Built fresh for your order
- Everything in Lead Package
- Cold email scripts
- Phone scripts
- Market research report
- SEO audit
All packages are one-time purchases · No subscriptions · Delivered within 3–5 business days
Common questions.
Ready to build your demolition list?
Let's talk.
Fill this out and I'll follow up within 1 business day.
I got it.
Expect a reply within 1 business day.
Other lead lists for trades.
Permit-pipeline verified — the demo is about to start.
Current pageCracked and failing slabs, flatwork and driveways.
See details →Failing perimeters and new-build permit pipeline.
See details →Same lots as sealcoating and striping; bundle the pull.
See details →